+1 407 337 0110 hello@redmeters.com

The Difference is Clear

RM Series 2 in Dredging

  • Determining how much material is pulled onto the dredge.
  • Measuring density of material before and after de-sliming process.
  • Monitoring materials after separation.
  • Determining final density after dewatering stage.
  • Calculating how much material is moved to the vessel hopper (ensuring no over-fill).
  • Measuring materials unloaded from vessel hopper to final destination.
  • Equipment for measuring reprocessing of tailings

About Us

Red Meters innovates the future of understanding in a real-time, continuous manner. Specializing in data monitoring and analytics, the Red Meters vision is to create a density meter alternative with the unmatched quality of our non-nuclear density measurement systems. Built inline with slurry pipelines, the RM Series allows for process automation with +/- 0.25% accuracy over a 6:1 density range. Each RM system is calibrated to NIST, OIML, and ASTM standards, meaning our instruments are smarter, faster, and better for better for your industrial application. Read More.

6520 Pinecastle Blvd

Orlando, FL 32809 USA

+1 407 337 0110

sales@RedMeters.com