+1 407 337 0110 hello@redmeters.com

DREDGING

BENEFITS OF A RM2

Land-Based Operations

  • Determining how much material is pulled onto the dredge.
  • Calculating how much material is moved from the dredge to the separation plant. (Optional)
  • Keeping track of waste rock removed during separation process. (Optional)
  • Measuring what materials are moved from the separation step to de-sliming.
  • Measuring density of material after de-sliming process
  • Calculating amount of materials taken to tailings after separation. (Optional)
  • Measuring materials after separation stage.
  • Determining Final density after dewatering stage.

Sea Operations

  • Measuring material picked up by the dredge.
  • Calculating how much material is moved to the vessel hopper (ensuring no over-fill).
  • Measuring materials unloaded from vessel hopper to final destination.

6520 Pinecastle Blvd

Orlando, FL 32809 USA

+1 407 337 0110

sales@RedMeters.com